End of injection mould maintenance eight Suggestions
Author: Hit:2375 CreateTime:2009-12-21 09:06:56

Each injection molding position for annual maintenance program depends on the different mold cycle. Here are some general principles can make each mould users to ensure hot runner, heater, guide pillar and thimble mold components such as effective operation, to prevent the occurrence of unexpected circumstances.

1. Check the scattered hole if there is a warning of rust or damp phenomenon - if you are found near hot runner vent have rust or damp phenomenon, it means that the internal condensation or possible water pipe burst. Damp phenomenon could cause short circuit of heater is deadly. If the machine is not all year-round to run, but in the evening or weekend will shut down, this will increase the risk of condensation phenomenon.

2. Remind operators don't put the gate in the hot mouth to "clean up" off - if the operator happened to see there was a piece of stainless steel in the mold runner, it might be shuikou component is actually a point. "Clean" this seemingly is often destroyed hot tongue. Not to damage the hot mouth, please confirm before taking action under the tongue type of hot runner system, ensure that all operators are trained and able to identify their access to all of the different types of tongue.

3. The taxi stop button - for all year-round operation of the machine, the work should be conducted once a week. At the end of a good time to give these parts to a routine of lubricating maintenance.

4. Interaction to verify the resistance of the heater - you should start to use the heater was measured the resistance value of it, now it is time again to measure and compare. If there are 10% of the floating up and down resistance, can consider to replace the heater in order to make sure it won't be in the critical moment in the process of production out of the situation. If there is no measured the resistance value of the original from the measuring a right now and check the heater in the future will be the value used as the reference data.

5. Check the guide pin and guide suites for signs of wear - looking for have a shave? P or wipe? P and so on, the wear is due to lack of lubrication. If the mark is just emerging, you can also pass to guide pillar and guide bush lubrication to prolong its life. If the wear is very serious, it's time to replace the new parts. Otherwise, the mold cavity and core parts may not fit well, different parts in the cavity wall thick.

6. Check the current situation in water outlet connecting a hose, let the water through the pipe until the pail. If the flow of water is not clear or colored might have rust occurs, the current weak means somewhere jam. If it is found that these problems will all pipe drill wear again, ensure unblocked (or take you to the most commonly used any method to clean). Improve the plant water treatment system can prevent the recurrence of future caused by rust and blocking all kinds of problems.

7. Clean the thimble - after a year's time, thimble will due to hoarding and membrane gas impurities become very dirty. Recommended every six to twelve months to get a good cleaning with mold cleaning agents. After cleaned, coated with a layer of lubricant to prevent scratches on thimble or fracture.

8. See hot pot mouth radius area if there is a fracture - fracture by residual heat in the machine's mouth loose hardens when pieces of plastic injection molding forward from injection plastic cylinder clamping force caused by the component. The cause of the problem may be the center line of the no alignment. When found fracture want to consider these two possibilities. If all the damage has been too serious to prevent petals shape leakage (mold users previously used a term refers to between the guide sleeve and hot mouth of the machine of plastic leak), you should replace gate set.

Using these tips will help you to find and to prevent potential problems, ensure your mold is always running in top form.

国产91一区二区三区 | 亚洲精品无人一区二区 | 国产成人无码aa | 美女黄视频无遮挡在线看h 久久精品国产久精国产69 | 搡老熟女国产1000部 | 国产乱人偷精品人妻A片 | 国产又色又爽又黄又免费 | 亚洲色婷婷综合久久久久中文 | 日本高清视频在线观看 | 亚洲国产精品99久久久久久久久 | 国产精彩视频999 | 欧美一级黄色大片 | 亚洲AV色区一区二区三区 | 中文字幕在线免费看线人 | 五十歲熟女亂伦一区二区免费视频 | 国产成人精品无码 | 欧美一级婬片A片无码潘金莲直播 | 四季岛国AV无码一区 | 五月天综合激情网 | 精精国产XXXX视频在线播放一88 | 国产又粗又猛又爽又黄的视频色戒 | 成人性爱视频网站 | 中文无码人妻丰满熟妇啪啪 | 亚洲国产成人久久一区二区三区 | 丰满岳妇乱一区二区三区 | 国产精品福利亚洲一区二区三区17c | 同性恋一区二区三区久久 | 水户香奈无码破解播放 | 无码中文字幕一区二区免费蜜桃 | 17c在线精品无码 | 亚洲福利诱惑小视频 | 人人妻人人澡人人爽 | 无码人妻少妇久久中文字幕 | 五十路老熟女 码A片 | 国产清纯美女午夜福利诱惑视频 | 国产成人精品人妻无码 | 一区二区三区在线播放 | 欧美一级婬片A片无码区 | 精品一区二区三区无码 | 国产成人免费电影 | 韩国精品久久久久三级无码 |